How to install a sub-panel?
Installing a sub-panel (secondary distribution panel) is governed by several articles of the Quebec Construction Code:
Installation rules:
- A sub-panel must be fed by a dedicated breaker in the main panel
- The feeder conductor must be sized for the sub-panel load, with a minimum of #8 AWG copper for a 40 A sub-panel
- Maximum distance: no specific limit, but voltage drop must be less than 3%
- Neutral and ground must be separated in the sub-panel (isolated neutral bar, ground bar bonded to the enclosure)
Common uses:
- Detached garage (60 A, buried TECK90 cable)
- Finished basement with several new circuits
- Workshop with heavy machinery
- Home extension (addition)
Installation must be done by a CMEQ-certified electrician and an RBQ inspection may be required depending on the municipality.